Project Project Manager: ANH TRUONG 3KW – LOAD-BASED
25 Nguyen Cong Hoan Street, Ho Chi Minh City
Capacity
3,6 KW
Savings
7,130,000 VNĐ
Project Overview
A 1.2 MWp solar power system has been installed in Duc Hoa, Long An. The project helps the business save 3.2 billion VND per year and reduce 1,200 tons of CO2 emissions, aiming for a Net Zero goal.
Project Efficiency
Energy Output
3.100 kWh/year
kWh/year
CO₂ Emissions Reduction
1,500 kg CO2/year
tons/year
Cost Savings
7,130,000 VNĐ
per year
Main Equipment
Inverter MIN 3KW; Pin JA Solar 455W
