Project Project Manager: Mr. My’s House
District 8 - Ho Chi Minh City
Capacity
5,2 kWp
Savings
10,580,000 VNĐ
Project Overview
A 1.2 MWp solar power system has been installed in Duc Hoa, Long An. The project helps the business save 3.2 billion VND per year and reduce 1,200 tons of CO2 emissions, aiming for a Net Zero goal.
Project Efficiency
Energy Output
4.600 kWp/year
kWh/year
CO₂ Emissions Reduction
5.800 kg CO2/year
tons/year
Cost Savings
10,580,000 VNĐ
per year
Main Equipment
Inverter Growatt Min 5000TL-X; HT SAAE 405Wp battery (13 panels)