Project Project Manager: Mr. My’s House

District 8 - Ho Chi Minh City

Capacity
5,2 kWp
Savings
10,580,000 VNĐ
Project Manager: Mr. My’s House

Project Overview

A 1.2 MWp solar power system has been installed in Duc Hoa, Long An. The project helps the business save 3.2 billion VND per year and reduce 1,200 tons of CO2 emissions, aiming for a Net Zero goal.

Project Efficiency

Energy Output 4.600 kWp/year kWh/year
CO₂ Emissions Reduction 5.800 kg CO2/year tons/year
Cost Savings 10,580,000 VNĐ per year
Main Equipment Inverter Growatt Min 5000TL-X; HT SAAE 405Wp battery (13 panels)

Real Project Images

Liên hệ qua ZaloOA Liên hệ Fanpage Alena Energy