Project Project Information: DUY TAN PLASTIC FACTORY – LONG AN
Hai Son Industrial Park – Long An
Capacity
10.000 KWp
Savings
550 tỷ/25 year
Project Overview
A 1.2 MWp solar power system has been installed in Duc Hoa, Long An. The project helps the business save 3.2 billion VND per year and reduce 1,200 tons of CO2 emissions, aiming for a Net Zero goal.
Project Efficiency
Energy Output
15.000.000 kWh/year
kWh/year
CO₂ Emissions Reduction
10,000 tons/year
tons/year
Cost Savings
550 tỷ/25 year
per year
