Project Project Information: DUY TAN PLASTIC FACTORY – LONG AN

Hai Son Industrial Park – Long An

Capacity
10.000 KWp
Savings
550 tỷ/25 year
Project Information: DUY TAN PLASTIC FACTORY – LONG AN

Project Overview

A 1.2 MWp solar power system has been installed in Duc Hoa, Long An. The project helps the business save 3.2 billion VND per year and reduce 1,200 tons of CO2 emissions, aiming for a Net Zero goal.

Project Efficiency

Energy Output 15.000.000 kWh/year kWh/year
CO₂ Emissions Reduction 10,000 tons/year tons/year
Cost Savings 550 tỷ/25 year per year

Real Project Images

Liên hệ qua ZaloOA Liên hệ Fanpage Alena Energy